NEWS

Why Do High-Rise Windows Leak During Heavy Rain?

David Garvey | 10 2026

High-rise windows leak during heavy rain when wind pushes water through weak weather seals, or rain enters a frame faster than its drainage system can remove it. Sometimes the window isn’t the entry point at all: the fault lies where it meets the surrounding façade. A repair needs to address that distinction, otherwise the next storm can expose the same problem.

At Crown Services, we investigate high-rise window leaks by tracing where water enters before deciding what needs repairing. The visible damp patch tells us where water has appeared, but it doesn’t necessarily identify the failed component.

Wind Can Push Water Through Otherwise Dry Joints

Heavy rainfall supplies the water, but wind can provide the force that moves it through the building’s exterior. The National Research Council of Canada’s research on wind-driven rain penetration identifies air-pressure differences as a significant driver of water entry. That helps explain why a window might remain dry during steady rainfall, then leak during a shorter, windier storm.

As CWCT’s guidance on pressure equalisation explains, some glazing systems reduce this pressure difference through a ventilated space behind the outer weather seal. The cavity allows pressure behind that seal to approach the pressure outside, reducing the force driving rain inwards. However, the inner air seal must remain effective for this arrangement to work properly.

This gives us a reason to look beyond visible exterior silicone during a window inspection. An apparently intact outer seal doesn’t rule out a problem with the inner gasket. In these systems, repairing only the outside can leave the pressure-control weakness unresolved.

Blocked Drainage Can Turn Manageable Rainwater Into a Leak

Water behind an outer glazing seal isn’t automatically evidence of failure. CWCT’s guidance on glazing drainage explains that many framing systems are designed to collect water passing the first line of defence and drain it back outside. The problem begins when that drainage route no longer works.

A partly obstructed outlet may cope with a small amount of water but struggle during sustained rainfall. As water collects inside the frame, it can reach joints that allow it into the building. A leak that starts some time after the rain begins gives us a reason to investigate drainage capacity, although timing alone can’t confirm the cause.

Don’t assume small openings around the bottom of the frame need sealing. Some are intentional drainage outlets. Covering them can interfere with the very route that should be carrying water away, so we recommend checking the system’s drainage arrangement before any resealing work.

Maintenance records can help here. Reynaers’ operation and care guidance (PDF), for example, calls for cleaning the chamber between moving and fixed window sections every six months, with drainage slots cleared when necessary. Check your own system’s instructions against the maintenance history rather than assuming that clean glass means the window has been fully maintained.

Failed Seals May Reflect a Joint That Can’t Move Properly

Not all failed window seals have simply worn out. High-rise glazing and the surrounding construction move as temperatures change. Dow’s weatherseal joint guidance (PDF) explains how different materials expand by different amounts. A weatherseal joint needs enough flexibility, supported by suitable joint dimensions, to accommodate that movement without splitting or losing its bond.

That’s why we wouldn’t specify another layer of silicone solely because the existing bead looks cracked. The repair needs sound bonding surfaces and a joint shape suited to the movement. Where required, backing material stops the sealant sticking to the base of the joint, allowing it to stretch between the sides rather than being restrained on all three surfaces. Repeating an unsuitable detail can repeat the failure.

There are alternatives to conventional resealing in some circumstances. Dow’s Trimont high-rise case study (PDF) describes recurring window-frame leaks in Pittsburgh treated with preformed silicone seals. The building manager reported no further leaks during subsequent heavy rain. It’s a manufacturer-reported result, not a universal specification, but it illustrates why a lasting repair may require a different joint detail rather than more of the same sealant.

The Fault May Be Around the Window, Not Within It

Window water ingress can occur at the junction between the frame and the wall, even when the window unit itself isn’t defective. Research from the National Research Council of Canada (PDF) highlights the importance of correctly detailed flashing and drainage at this interface. Replacing the glass won’t repair a defective surrounding junction.

We also recommend comparing reports from different floors before treating every leaking window as an isolated repair. Similar symptoms at the same junction justify investigating a repeated detail. They don’t prove that every window has the same fault, but they help define an investigation rather than a series of unrelated sealant patches. ASTM’s leakage-investigation guidance similarly considers the wall as a connected system and recognises that findings may apply to comparable locations.

A Water Test Needs to Match the Conditions Behind the Leak

For intermittent high-rise window leaks, we recommend recording the following while observations are fresh:

– The precise location: identify the floor and window, then photograph where water first appears.

– The timing: note whether dripping starts immediately or after prolonged rain, and whether it continues afterwards.

– The wind conditions: record the direction and whether gusts coincide with increased leakage.

– Previous repairs: keep the dates and scope of work, including whether the same symptom returned.

These records help us investigate the conditions behind the leak rather than relying on how the window looks during a dry inspection.

A window that stays dry during a brief spray test hasn’t necessarily been cleared of a wind-related fault. A specialist may need to combine controlled water application with an air-pressure difference across the assembly. ASTM E1105 describes this approach for installed windows and curtain walls, while stressing that the selected pressure must reflect the circumstances being assessed.

The method also needs to suit the joint. Illbruck’s site water-tightness testing guidance (PDF) distinguishes hose testing of permanently closed joints from testing opening vents or open-jointed systems. Simply directing a powerful jet at every opening isn’t an appropriate substitute for a planned investigation.

Once the cause is established, agree how the repair will be checked. Allow the specified materials to cure before retesting, and make sure the report records what was changed. A neat-looking sealant bead is evidence of completed work, not proof that the original leak has been resolved.

Get the Leak Investigated Before Specifying the Repair

Don’t lean out of a high-rise window to clear external drainage slots or apply sealant. Exterior inspection and repairs need suitable access, with measures to prevent falls. HSE guidance on working at height prioritises avoiding work at height where possible and using appropriate protection where it can’t be avoided.

At Crown Services, we provide water ingress investigations alongside high-level window repairs. Where the entry point isn’t clear, our water or dye testing can help trace it so the proposed work addresses the source.

Contact our team to discuss recurring high-rise window leaks and arrange an investigation before committing to another round of repairs.

Crown Services Logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.