Horton Kirby 50m Brick Chimney

The Task

The grade two listed 50m chimney based in the middle of a housing complex had begun to deteriorate, so mortar was becoming a real fall risk for residents and cars below. A different contractor wrapped the chimney in plastic to temporarily stop any falling debris, but this soon began to deteriorate and reveal sections of the chimney therefore posing a Health and Safety risk.

The Solution

Crown Services were contacted to strip the plastic wrapping off the chimney and come up with a new workable solution. We erected cradles to access the full height of the chimney on each side, before installing our specialist bespoke masonry encapsulation netting which then caught any failed mortar and prevented any fall risks at ground level.

Since the chimney is grade listed, Sevenoaks Council and conservation officers were involved with all works. The final stage of this project was to install a frame deck scaffold to the summit of the chimney, carefully remove the netting one section at a time, then rake out and repoint the mortar joints before moving down to the next section.

We worked with the residents throughout the project to ensure they were kept up to date with the progress of the work and put a huge emphasis on keeping the site tidy and safe so that it had minimal effect on the busy car park below. Resident involvement was actively encouraged throughout the programme of work, so that all stakeholders had input into the working hours.

The results

  • Prevention of failed mortar falling on residents or cars parked below

  • Restoration of a grade two listed chimney to a suitable conservation standard

  • Resident engagement with the programme to ensure that all stakeholders are involved within the project

  • Prevention of any further deterioration to the structure

  • The centre piece of the housing complex is now something the community members can be proud of

SERVICES

Case Studies

Basil Chambers

Basil Chambers
Basil Chambers

Full external survey carried out to inspect issues with timber windows, pointing, stonework and rainwater goods

Read More >

Bruntwood Suspended Scaffold

Bruntwood Suspended Scaffold
Bruntwood

Suspended Scaffolding to repair water ingress problems on multiple elevations

Read More >

Crown Services carried out a full building refurbishment project for us via a combination of specialist access methods on a busy City Centre building. It all went so smoothly and we couldn’t fault the service provided by Crown!

Brett Sadler
Property Manager

Get in touch with us

  • This field is for validation purposes and should be left unchanged.